Boca Bearings Workshop

▼

›
bocabearings.com/blogs

RC Boat Project: Update 2

›
The PLA hull was sanded down starting with a heavier P150 grit sandpaper. After that I switched to P220 and finally P320 to get the hull as ...

Boca Bearings Workshop Weekly Update 15

›
Not much was done on my personal project this week because the group go kart took priority. However, the first half of the hull was printed ...
1 comment:

Power Wheels Racer 2.0: Update 2

›
This week in the workshop we focused on the electronics for the electric kart. After spending over a week trying to diagnose and fix whateve...

Boca Bearings Workshop Weekly Update 14

›
Some final adjustments were made to the hull of the sub. Using Solid works the hull was thickened for strength and and holes were added for ...

Power Wheels Racer 2.0: Update 1

›
Over the past several months us here at The Workshop have been designing and fabricating the next generation of go-kart for our entry int...
3 comments:

Electric Skateboard Project Update 2

›
Quick update to the skateboard! In an effort to diagnose issues with another project I needed to salvage some known working parts from so...
1 comment:
›
Home
View web version
Powered by Blogger.